Waterproofing

Cast-in barrier for expansion and construction joints

A waterstop is a physical barrier cast into the joint itself, forming a continuous diaphragm that water cannot get past. It is the specified solution wherever a joint has to both move and stay watertight: expansion joints in tanks, reservoirs, canals and deep basements.

The centre bulb accommodates movement between the two concrete sections while the ribbed wings lock into each pour. Getting the profile, the position and above all the site joining right is what determines whether it performs.

Supplied to contractors and builders, or supplied and applied by our own teams with a written warranty.

Key Features & Benefits

  • Continuous physical barrier through the full joint depth
  • Centre bulb accommodates joint movement without tearing
  • Ribbed wings develop mechanical key into both concrete pours
  • Available in externally placed and centrally placed profiles
  • PVC and rubber grades for different chemical exposures
  • Heat-weldable on site for continuous runs, corners and junctions
  • Long service life when correctly embedded and compacted around

Where It Is Used

  • Expansion joints in water tanks and reservoirs
  • Construction joints in basement rafts and walls
  • Sewage and effluent treatment tanks
  • Canals, channels and spillways
  • Swimming pools and water features
  • Tunnels, culverts and underground structures
Technical Data

Specifications

MaterialPlasticised PVC / natural rubber
ProfilesCentre bulb, dumbbell, ribbed, kicker and external types
Widths150 mm, 200 mm, 230 mm, 250 mm and 300 mm
Thickness3 mm to 10 mm depending on profile
Tensile strengthTypically greater than 12 MPa
Elongation at breakTypically greater than 300 %
SupplyRolls of 15 m to 20 m; site welding kit available

Typical values for guidance. Actual figures vary by grade and manufacturer. The data sheet for the exact product supplied on your project is provided with delivery.

Packaging & Supply

Rolls of 15–20 m. Prefabricated corners, junctions and welding equipment available on request.

Method

How It Is Applied

The sequence our teams follow, and the sequence we recommend to contractors buying the material from us.

Position

Set the waterstop centrally in the joint with the bulb aligned exactly on the joint line.

Secure

Tie the wings to the reinforcement at close centres so it cannot fold over during the pour.

Join properly

Butt-weld ends with a heated blade. Never overlap, and never tie with wire alone.

Compact carefully

Vibrate concrete thoroughly under and around the wings; trapped voids under a waterstop defeat its purpose.

Protect

Keep the exposed half clean and undamaged until the second pour.